Thursday 7 June 2012

The finalised building site

Last week, Neal-the-Architect sent us the latest survey report.
At 5:30pm on a Friday.
This is a little snapshot of the survey:


The whole survey represents only a very small part of our 57acres.
  • The house site is a little to the north of the "Reference Gum" - a Tasmanian Blue Gum with a diametre of at over 60cm and about 30metres tall - the house will be cut into the small ledge you can see delinated by the survey lines
  • The dog-legged straight lines show the gravel road 43.57metres and 38.26meters on either side of the surveyed plot
  • Where the survey lines end is the edge of the cliff. It is much higher than our initial choice of building location, but still comprised of the same amazing Jurassic dolerite rock formations:

All this means that (all things going to plan) Neal-the-Architect has spent the past few days sketching out the initial schematic designs.
We are trying very hard to not pre-empt what the design will look like....

No comments:

Post a Comment

Please talk to us - Leave a comment!